The Langlade County Land and Water Resource Management Plan is drafted as a 5-
year plan (2015-2019) with a 5-year Work Plan (2015-2019) in accordance to the
requirements set forth in Chapter 92 of the Wisconsin Statutes.

North Central Wisconsin Regional Planning Commission
Providing Economic Development, Geographic Information Systems, Intergovernmental Cooperation, Land Use Planning and Transportation Assistance since 1973
The Langlade County Land and Water Resource Management Plan is drafted as a 5-
year plan (2015-2019) with a 5-year Work Plan (2015-2019) in accordance to the
requirements set forth in Chapter 92 of the Wisconsin Statutes.
The Marathon County Transportation Coordinating Committee (TCC) is responsible for the elderly and disabled transportation in the County. The TCC has determined it wants a better understanding of what the needs are for transportation for these groups across the County. This Needs Assessment is intended to compile information the TCC can use to begin to make decisions as to whether they have, at least at the County level, the ability to meet some of the needs that are out there and do some things where those needs might occur.
The Vilas County Land and Water Resource Management (LWRM) Plan is drafted as a 10-year plan (2015-2024) with a 5-year Work Plan (2015-2019) in accordance to the requirements set forth in Chapter 92 of the Wisconsin Statutes.
State Trunk Highway (STH) 64 (aka East Main Street) is one of the City of Merrill’s two principal arterials and is the major east-west corridor through the city. The other principal arterial is the north-south Center Avenue/County K (Bus. 51) corridor. The STH 64 / East Main Street and Pine Ridge Avenue intersection area is one of four major areas of employment in the city. Recent and proposed development on Pine Ridge Avenue have raised concerns about the effect of those changes on the operations and safety of STH 64 / E. Main Street and the interchange ramps from STH 64 to USH 51. The purpose of this study is to determine potential future mitigation measures and improvements on STH 64 as well as the local street network for safety and operations.
The Village of Spencer requested traffic counting services from the North Central Wisconsin Regional Planning Commission for three locations within the Village.
Outdoor Recreation Plan
The primary purpose of this recreation plan is to provide continued direction toward meeting the current and future recreation needs of the county. This is accomplished through an inventory and analysis of outdoor recreational facilities, and the establishment of recommendations to meet identified needs.
This Outdoor Recreation Plan (ORP) was prepared pursuant to Wisconsin Statute §23.30 Outdoor Recreation Program. This section serves “to promote, encourage, coordinate, and implement a comprehensive long-range plan to acquire, maintain, and develop for public use, those areas of the state best adapted to the development of a comprehensive system of state and local outdoor recreation facilities and services…”
The primary purpose of this outdoor recreation plan is to provide continued direction toward meeting the current and future recreation needs of the Village of Rothschild.
A road surface management plan for a local road network provides a town with the ability to plan for future road surface improvements. With a road surface management plan in place, the limited resources allocated to local roads can be better spent. The overall goal of the Road Surface Management Plan is to help the town make better decisions on the improvements to the local road system. This document contains information vital to the review and rating of the Town of Lake Tomahawk’s roadway system. Thus, the Road Surface Management Plan will assist in preserving and rehabilitating the existing town road system in a timely and cost-effective manner.
.